Back in March OneOK purchased a right away on our north fence line so that they could run a liquid natural gas line. This pipeline connects with the main line that starts near Huston, Texas and ends in Wyoming. A crew came in and cut a path 50 feet wide, taking out a bunch of trees. Some of the wood was cut up and stacked for us to use this winter but most of it was shredded and plowed under. The machine they use to shred the trees is called the Beast!
Mike sitting beside the Beast.
The mouth of the Beast
Wood Chips Made by the Beast
Pipeline completed and ready for seeding
Looks like a county road! The girls and their friends really enjoy riding 4-wheelers on it!
No comments:
Post a Comment